Official catalogue and equipment photograph reviewed. No measured accuracy, installed safety validation or pressing trial performed.

Hushengyuan plate-style servo hydraulic press

Customisable servo-driven hydraulic pressing reference for mechanical-part assembly. Published stroke, speeds and control descriptions need a signed configuration and part-specific acceptance plan.

A pressing station, not a finished transmission part

Choose the process around the actual assembly.

The original title is 板式伺服液压机. Hushengyuan describes a servo motor driving a hydraulic system, with tooling selected for different pressing applications. Mechanical assemblies, motor components and automotive steering, shaft and gearbox assemblies appear in its stated application list. [1] No excavator model, OEM part number or qualified construction-machine joint is identified.

Useful starting point

A buyer investigating a controlled insertion or assembly station can submit drawings, part samples, joint acceptance requirements and the factory’s handling/data constraints.

Not established here

The public page is not a stocked model offer. It gives no model code, dated price, available machine inventory, complete fixture drawing or validated production cycle.

Have the supplier identify whether its offer includes the bare press, dedicated tooling, measurement system, computer/software, guards and installation. Request recurring consumables and fixture changeover details separately.

Place the complete assembly inside the working space

Do not compare a part’s height only with the stroke.

Published dimensions and the drawing to request
Original parameterPublished valueBuyer check
Working stroke500mmApproach, insertion and withdrawal travel with the actual tooling.
Closed height200mmSupplier definition/reference surfaces and fixture-plus-part space at the required position.
Inner column span450mmControlled clearance drawing, fixture width and loading direction.
Table height750mmLoading method, workpiece handling and operator access in the proposed cell.

These entries come from the original catalogue. [1] Their combination does not establish your available tooling envelope. Ask for a dimensioned installation/working-space drawing showing reference positions, bed/ram tooling interfaces and access. No overall machine envelope, installed mass or foundation requirement was established.

A representative fixture review should identify part support, orientation, insertion tooling, removal and changeover. Include any conditions under which an incomplete or misaligned assembly must be rejected. The design owner must define the joint requirements; the press supplier should explain how the station will check them.

Keep readable values separate from unresolved entries

A catalogue inconsistency needs a supplier answer.

Data review before accepting a configuration
TopicOriginal entryInterpretation or clarification
Pump pressure1.5–10MPaHydraulic pressure range as published; not part-force capacity or a joint-pressure requirement.
SpeedsEmpty travel18.5–105.0; pressing3.5–20.0; return36.0–210.0mm/sSupplier ranges; no load/setting conditions or full production cycle established.
Position entriesMeasurement0.02mm; positioning control0.10mmDifferent labelled functions. Neither is a guaranteed finished-part tolerance.
Pressure entriesMeasurement0.2%fs; control200NFClarify measured quantity, full-scale range and meaning of “NF”. Do not invent corrected units.
Electrical powerPump3.7KW-4P; input three-phase four-wire1.8KW/AC380VEntries do not establish total connected power. Require signed electrical/load and supply requirements.
Pump displacement150px3/rMalformed published unit; no conversion to a volume unit has been made.
Output force label共进输出力0-10504KgFRetain the original label. Ask for rated pressing force, usable range and conditions; no inferred tonnage class.

The supplier says output can be customised. It also claims 40% energy savings compared with conventional hydraulic equipment, but publishes no test protocol or comparison baseline. [1] Neither the claimed saving nor cycle throughput is treated as a proven result. Require a revised, dated datasheet for the configuration actually offered.

A curve needs an accepted decision rule

Check the assembly, not just a green screen.

The source describes force on the Y axis, displacement on the X axis, synchronous collection, final-position comparison and historical curve overlays. It gives minimum display increments of 0.01kN and 0.02mm. [1] Display granularity does not demonstrate calibration, repeatability or accuracy over the intended working range.

  1. Prepare labelled samples: identify acceptable parts and the failure conditions your process must detect.
  2. Agree references: define starting position, relevant datums, working ranges and verification method.
  3. Approve the judgement: document the project’s acceptance rule and who authorises its changes.
  4. Challenge the station: run the agreed sample conditions and retain curves, decisions and inspection results.
  5. Retrieve the evidence: demonstrate searching/exporting records for identified parts and the accepted recipe revision.

The published storage and user-permission functions do not establish a particular file format, database connection, backup method or retention period. Ask for a sample export and integration demonstration before accepting the software package. No generic tolerance or acceptance window is assigned by CivilEquip.

Accept the station twice: before shipment and at your site

Use the same agreed part and record requirements.

Supplier demonstration

Identify the offered hardware/software, fixture and measurement configuration. Witness the agreed sample checks and document unresolved items, revised units, services and supplied accessories.

Receiving-factory release

Review installation, handling, access and interfaces. Repeat the agreed checks using the installed station; record training, support responsibilities and the release decision.

HSE’s general UK work-equipment guidance addresses protection against dangerous access, isolation of energy, installation inspection and adequate training. [3] Use competent project-specific review for the applicable destination. The photograph does not prove guard interlocks, stopping performance, safe hydraulic behaviour or any conformity approval.

Clarify software version/licence, editable parameters, user permissions, error recovery, calibration support and replacement sensors. Agree who supports fixture changes and data migration. Warranty, service response, delivery date and commissioning cost require a configuration-specific offer.

Request a press configuration you can verify

Replace the blanks with your part and factory requirements.

Sources & review

  1. Original plate-style servo hydraulic press ↗

    Supplier photograph, applications, controls and exact parameter text. Malformed/mixed entries remain unresolved, not corrected by guessing.

    2026-10-11
  2. Control and automation development ↗

    Supplier descriptions of software, controls and industrial data collection; no software version or interface specification.

    2026-10-11
  3. HSE general work-equipment guidance ↗

    UK use-side guarding, isolation, installation checks and training context; not machine approval.

    2026-10-11

Specifications come from the manufacturer’s published information and the sources above; buying advice is written by CivilEquip with AI assistance. Ask the manufacturer to confirm the data for your configuration. Editorial policy · Report a correction.