Ougan presents load cells for self-balanced foundation pile testing, including bored-pile applications. The official image shows the load-cell development and equipment context. Rated load, cell arrangement, pile dimensions, instrumentation and installation p…
The official SANROCK crawler drilling catalogue lists this product as a 350m water well drilling rig. The stated depth belongs to the catalogue listing and is not a site performance guarantee. Confirm ground conditions, drill diameter, air supply and the exac…
Before you request a quotation
A drilling depth in a catalogue is not a promise for every ground condition. Describe the geology, intended diameter and supporting equipment, or the pile-testing brief for load-cell enquiries.
Separate drilling production from foundation testing
Water-well drilling rigs and pile load cells are both present here but have different purchasing purposes. The rig needs ground, bore and tooling information. A load-cell proposal needs the foundation engineer’s test design, instrumentation and project responsibilities.
Decision
Useful information for your brief
Well drilling
Ground conditions, bore diameter/depth, method, rig and compressor/tooling scope
Pile testing
Pile geometry, loading programme, selected cell and instrumentation/installation scope
Deliverables
Model-specific documents, project drawings, acceptance method and responsibility split
Coverage and limitations
The 350 m rig label is a catalogue designation, not a site-specific depth guarantee. A load-cell listing is equipment information, not evidence of a passed pile test.
Can drilling and testing offers be ranked by a single capacity figure?
No. Compare equipment within the same task and under the same defined conditions. Drilling depth and load-cell rated load describe different functions.
Procurement framework by CivilEquip Editorial Team. Follow the product links above for manufacturer sources; the framework is editorial guidance, not machine ratings or an engineering approval.