FIND THE RIGHT EQUIPMENT
Cranes
Explore machinery by specification and manufacturer. Build a shortlist for your next project.
Open your comparison
Equipment
0 results
Your next machine starts with a brief.
No published machines match this view. Adjust your filters or share the job, specifications and destination to start a sourcing request.
Prepare a useful sourcing request
- The applicationMaterial, terrain and the work you need to complete.
- The configurationMachine size, attachments and required specifications.
- The deliveryDestination, quantity and your preferred schedule.
Before you request a quotation
Specify the heaviest load together with its required radius and height. Ask the supplier to identify the applicable load chart, boom configuration and site-support assumptions.
Read our buying guides →Start a crane enquiry with the lifting plan
A nominal crane-capacity label cannot describe a proposed lift. Provide load details, required radius/height, ground and access constraints so the responsible lifting specialist can determine the appropriate arrangement. This directory is not a lift-plan approval service.
| Decision | Useful information for your brief |
|---|---|
| Lift requirement | Load details, radius, height, movement and site/access constraints |
| Crane configuration | Exact boom/jib, counterweight, outrigger or crawler arrangement and relevant load chart |
| Scope and responsibility | Rigging, mobilisation, inspection documents and the responsible lift planner/operator |
Coverage and limitations
There are currently no matching complete crane entries. Do not infer a complete crane supply from a hydraulic winch or transmission component profile.
Does a nominal capacity establish my lift is permitted?
No. The applicable load chart, configuration and site-specific lifting plan need review by the responsible qualified party. A catalogue title cannot approve a lift.
Procurement framework by CivilEquip Editorial Team. Follow the product links above for manufacturer sources; the framework is editorial guidance, not machine ratings or an engineering approval.
Prepare a category enquiry