Hengda NB aluminium brazing line
A continuous nitrogen-protected aluminium brazing line catalogue for heat-exchanger production. Twelve configurations give working-size, installed-power and line-length references; part qualification remains project-specific.
Start with the assembly, not the longest furnace
NB is a production-line enquiry, not a ready-made construction cooler.
The original page describes continuous brazing under nitrogen with non-corrosive flux, for automotive aluminium intercoolers, radiators, air-conditioning condensers, evaporators, heater cores and oil coolers. [1] It does not identify a construction-machine part number or qualify any alloy/joint design for your equipment.
Send a representative assembly
Provide drawings, alloy and joint details, filler/flux specification, fixture geometry, loading weight and target rate. Include the largest assembly and the least forgiving joint, rather than only a small demonstration piece.
State what must pass inspection
Define the finished part checks with the design owner. If leakage, joint condition or deformation matters, agree the test method and acceptance limits before the supplier runs samples.
Hengda’s listed furnace manufacturing scope supports an enquiry for upstream processing equipment. [2] It does not establish that the catalogue includes the entire pretreatment, assembly, testing and cooler-production system.
Shortlist a size from the original rows
Read the working dimensions with your fixture included.
| Model | Working size / rated power | Brazing section / total length |
|---|---|---|
| NB-450-150 | 450×150 mm · 242 kW | 6 m / 28.5 m |
| NB-450-200 | 450×200 mm · 242 kW | 6 m / 28.5 m |
| NB-600-200 | 600×200 mm · 303 kW | 8 m / 29 m |
| NB-600-300 | 600×300 mm · 303 kW | 8 m / 29 m |
| NB-800-200 | 800×200 mm · 515 kW | 11 m / 37.7 m |
| NB-800-300 | 800×300 mm · 515 kW | 11 m / 37.7 m |
| NB-1000-200 | 1000×200 mm · 615 kW | 11 m / 37.7 m |
| NB-1000-300 | 1000×300 mm · 615 kW | 11 m / 37.7 m |
| NB-1100-200 | 1100×200 mm · 655 kW | 11 m / 37.7 m |
| NB-1100-350 | 1100×350 mm · 685 kW | 11 m / 37.7 m |
| NB-1200-200 | 1200×200 mm · 715 kW | 11 m / 37.7 m |
| NB-1200-350 | 1200×350 mm · 735 kW | 11 m / 37.7 m |
All twelve rows list 380 V, three phase and 750°C rated temperature. [1] The source labels the paired dimensions simply “working size”; it does not explicitly define usable belt width, height allowance or fixture clearance. Obtain a section drawing and confirm which dimensions control passage.
The same page offers other brazing-section lengths according to output requirements. That wording does not give a parts-per-hour guarantee. Before choosing a row, ask for a loading drawing showing fixtures and spacing, plus the proposed belt speed and cycle for your parts.
Do not turn the rating into operating cost
Three missing inputs change the purchase.
Electrical demand
The 242–735 kW values are published rated power, not measured average consumption. Request the connected-load schedule, auxiliary loads and expected running demand under a defined production condition.
Complete installation space
The table’s 28.5–37.7 m total length omits a reviewed general arrangement for your site. Have the offer show loading/unloading, service access, utility equipment and installation clearances.
Process consumption is also unresolved. No reviewed source gives nitrogen flow, cooling-water requirement, start-up consumption, cycle-specific energy or output. Cost comparison needs the same assembly, loading pattern and production rate on each offer. A wider line with the same catalogue length is not automatically cheaper per acceptable part.
750°C is a rating, not your brazing recipe
Qualify the part, loading and atmosphere together.
Do not set the workpiece cycle from the furnace’s maximum/rated temperature. Agree the required thermal history for the actual assembly and materials, then have the supplier show that the proposed loaded line can deliver it. This page does not supply an operating recipe.
General aluminium-brazing guidance explains that incoming products, the belt and entry/exit conditions can introduce moisture and oxygen, so supply-gas purity alone does not establish the atmosphere at the joint. It recommends measurements in the critical brazing zone. [3] This source is not a test of Hengda equipment; have the process engineer define sampling points and acceptance conditions for your trial.
- Freeze trial inputs: identify parts, alloy/filler/flux, fixtures and loading arrangement.
- Record process evidence: agree loaded-part temperatures, belt condition/speed and atmosphere readings, including instrument records.
- Inspect traceable parts: link inspection results to the identified run and agreed acceptance method.
- Resolve variation: define repeat-run checks, corrections and the acceptance authority before release.
No reviewed data establishes this line’s temperature uniformity, guaranteed yield or a qualified construction-machine cooler process. Ask for test evidence against your specification, rather than substituting a different customer’s headline result.
Make the line boundary visible in the quotation
An installed furnace and a working production process are separate deliverables.
- Preparation and handling: identify cleaning, flux application, drying, fixtures and loading equipment included or buyer-supplied.
- Utilities and controls: list nitrogen supply, connection points, measurement equipment, control records and destination electrical configuration.
- Project support: agree transport packaging, unloading, installation, commissioning, training and spare-part scope.
- Acceptance and changes: specify factory/site trials, sample supply, correction ownership and when payment milestones are earned.
Price, MOQ, current delivery date, warranty terms, export compliance and local service coverage are not established by the catalogue. Request a dated offer for an identified configuration and destination; keep every exclusion visible.
Request a line sized for your assembly
Edit this brief before reviewing the platform enquiry.
Sources & review
- Hengda NB continuous aluminium furnace page ↗
Twelve original configuration rows, nitrogen/non-corrosive-flux route and automotive heat-exchanger uses. Geometry labels do not define fixture clearance or output.
2026-10-11 - Hengda manufacturing introduction ↗
Industrial-furnace design, manufacture and installation statements; no trial for a particular NB order.
2026-10-11 - Aluminium Brazing: furnace conditions ↗
General explanation of nitrogen contamination and measurement in the critical brazing zone. No Hengda readings or supplier approval.
2026-10-11
Specifications come from the manufacturer’s published information and the sources above; buying advice is written by CivilEquip with AI assistance. Ask the manufacturer to confirm the data for your configuration. Editorial policy · Report a correction.