BEILUN · ALUMINIUM DIE DEVELOPMENT

Zonzao Die Development

Commission the tool.
Define its life after transfer.

A successful sample is useful only when the receiving factory can repeat the result. Put the casting, machine interface and transfer records into one project brief.

Which deliverable are you buying?

宁波众造模具科技有限公司 identifies its speciality as aluminium high-pressure die design and manufacture. Its introduction gives April 2016, consistent with the registered 13 April 2016 incorporation date. It lists industrial machinery among served sectors; the detailed cases reviewed here are labelled automotive components. [1] [4] No engineering-machine OEM or replacement-part approval is implied.

Tool supplied to your foundry

Define the receiving machine, mounting, connection and extraction requirements. Ask which plates, inserts, slides, accessories and records accompany the die.

Tool plus trial samples

Identify who conducts the trial, the material and machine used, sample quantity, approved drawing and inspection report. Make the sample release a recorded decision.

Ongoing castings or machining

The homepage offers small/medium casting runs and machining. Confirm the responsible producer, capacity assigned to your project and final-component acceptance; a die quotation alone does not include these.

The homepage says it has 280–5000T casting machines; the company introduction says produced tools match 280–4500T machines. These are different statements, not one verified machine inventory. Ask what equipment is actually available for your trial and which receiving machine the offered tool will match.

Make the design review easy to approve

The development page discusses parting, slides, replaceable pins, gating, venting and heating/cooling circuits. [2] Its quality page starts with part structure, wall thickness, dimensional review and a jointly optimised DFM report. [3] Ask for those decisions on your drawing, not a generic list of available techniques.

Document the decisions before cutting the die
Drawing concernBuyer decisionToolmaker response
Critical interfacesMark datums, fits, sealing surfaces and later machining.Identify formed versus machined features and inspection plan.
Moving detailsProvide side openings and assembly constraints.Show slides, wear details and replacement access.
Internal qualityDefine functional zones and agreed acceptance criteria.Explain proposed process, trial checks and evidence to deliver.
Receiving machineSupply machine model and controlled interface drawing.Confirm mounting, strokes, connections and installation scope.

Agree who releases a drawing change and how it affects cost, trial dates and the accepted revision. The website’s general precision and process claims do not establish a tolerance for every supplied casting.

Keep a trial result usable after transfer

Zonzao states that trial material should match the product material and trial-machine tonnage should match the customer’s machine. It also describes detailed trial process records and a full die history supplied at transfer. [3] These are useful contractual starting points, not evidence that your future order has passed.

  1. Agree the trial: specify material, receiving-machine requirements, fixture/tool configuration and samples.
  2. Link records: tie the tool identifier, revision, run settings and sample inspection to the same trial.
  3. Close changes: record modifications and repeat checks before accepting the final tool.
  4. Transfer the package: list drawings, material records, trial results, spare/wear details, handling and maintenance instructions.
  5. Verify at destination: define who supports installation and the receiving factory’s repeat-run acceptance.

Machine tonnage alone does not resolve every interface. Have the receiving foundry review the package before shipment. State ownership, storage, maintenance and any limits on copying or transferring the tool. A later process change needs its own review.

What is supported, and what still needs checking?

A Ningbo Polytechnic college report dated 5 March 2025 describes a staff visit on 27 February, including a factory walk and discussion of die development. [6] That independently supports a reported visit to the named company. It is not a technical audit, a current certificate check or a validation of individual castings.

The website’s cumulative 2000-tool figure, staffing and equipment counts lack effective dates; the manufacturing page itself gives different CNC counts. Request the resources allocated to your order. The special-equipment homepage case uses “400Kg” without a complete pressure unit or reviewed report, so it is not converted into a rated pressure or certification here.

Official contacts give Moganshan Road36, Beilun; the registered address is Xinda Road1069, building40. [5] Confirm the current workshop, delivery/inspection location and invoice entity rather than replacing the original record.

Prepare the die-transfer brief

Sources for this company

  1. Zonzao company introduction

    Exact Chinese entity, April 2016 founding, aluminium high-pressure die design/manufacture and stated industrial sectors. Undated cumulative figures not audited.

    Checked: 2026-10-11
  2. Development and manufacturing

    Supplier descriptions of slides, replaceable pins, gating, venting and thermal circuits; inconsistent CNC inventory not resolved into capacity.

    Checked: 2026-10-11
  3. Quality and tool-transfer workflow

    Published DFM, inspection, matching trial material/machine tonnage and process/history handover. No individual order acceptance report.

    Checked: 2026-10-11
  4. Original die-development cases

    Case-specific casting/tool dimensions, ADC12 labels, cavities/slides and machine references; automotive examples not engineering-machine fit.

    Checked: 2026-10-11
  5. Current official contact location

    Moganshan Road36; differs from raw registered Xinda Road1069 location.

    Checked: 2026-10-11
  6. Ningbo Polytechnic college visit, 5 March 2025

    College’s own report of factory visit and die-development discussion; external observation, not a supplier quality audit or product endorsement.

    Checked: 2026-10-11

Written for buyers from the manufacturer’s published information and the sources listed on this page, with AI assistance. Ask the manufacturer to confirm specifications, documents and terms for your order.