CONSTRUCTION
MACHINERY

XIKOU, NINGBO · PNEUMATIC COMPONENTS

Shunfa Pneumatic

Start with the air circuit.
Then choose the component.

A matching-looking valve can still have the wrong switching function, connector or thread. Use this catalogue to start a configuration enquiry, rather than as a machine-specific parts lookup.

Specify three connected layers

Shunfa identifies itself as a pneumatic-component producer. Its published scope includes air-preparation units, solenoid valves, actuating components and accessories, with machinery among its stated applications. [1] For a construction-equipment auxiliary system, the responsible designer must establish suitability. No excavator, concrete plant or particular machine installation is documented here.

Air supply

Define medium, available pressure under demand and air quality. Identify existing treatment and whether filters, regulators or other preparation components are included. A valve-body marking does not specify the entire air system.

Switching task

Provide the circuit symbol and required behaviour when operated, released and restarted. Identify manual controls and isolation separately. Request the offered valve’s symbol instead of relying on its family name.

Installation and wiring

Record complete port threads, mounting layout, fittings, coil supply and connector. State included accessories. Tie installed-component photographs and measurements to one equipment location.

The result should be a configuration the buyer can evaluate. A component offer does not replace the machinery designer’s circuit and safety review.

Resolve the catalogue’s model ambiguity

Two reviewed entries share the heading “4V series solenoid valve,” but show different controls. Entry 87 pictures a coil-operated 4V210-08; entry 94 pictures a pull/push control labelled 4R210-08. [2] [3] “The valve on the 4V page” is therefore an ambiguous order description.

Four items to identify an order
IncludeWhat it resolves
URL and marked modelDistinguishes the chosen photograph from similarly titled entries.
Symbol and reset methodConfirms the switching function and control type.
Coil and connector codesMakes supply, power and included connector a defined configuration.
Dimensioned drawingChecks port connections and footprint; a suffix alone proves neither.

Festo’s explanatory material distinguishes valves by ports, positions and actuation; coil count alone does not establish stable switching behaviour. [6] This frames the enquiry. Festo dimensions and performance are not transferred to Shunfa.

Request evidence for the actual supply route

The introduction describes development, processing and sales, and the workshop gallery supplies photographs. [1] [4] Neither identifies every operation performed on a particular valve or the source of each component.

Standard catalogue item

Ask who makes the body, assembles the valve, supplies the coil and performs final checks. Obtain current drawings and electrical data for that combination. Do not let a coil substitution silently change an approved configuration.

Modified assembly

Describe the modification separately: connector, mounting, air connection or base. Request a revision-controlled answer stating what changes, what remains standard and what requires another check.

The website refers to ISO 9001:2008 management requirements. No reviewed current certificate or issuing-body verification establishes valid present certification. This historical wording is not used as a quality badge or valve approval.

Approve a configuration you can reorder

  1. Record identity. Match valve label, coil label, connector and supplied accessories to the accepted quotation. Retain photos and revision.
  2. Agree functional checks. Set test conditions and acceptance criteria with the responsible designer. Request applicable supplier switching, leakage and electrical inspection methods; no measured result was provided by the reviewed source.
  3. Check installation. Review mounting, port access and cable/connector clearance against the approved drawing. Do not use a live machine as an improvised test fixture.
  4. Control changes. Preserve the approved parts list and sample records. Require notice of changes to coil, seal, body or connector before accepting a substitute.

Flow, temperature, duty, protection and cycle-life limits need model-linked data. Stock, price, quantity, dispatch and warranty remain quotation matters. A contact number does not establish overseas service coverage.

Separate legal identity from business history

The exact Chinese entity is 宁波奉化溪口顺发气动工程有限公司. Business-registration data and the official contact page both locate it in Xinjian Village, Xikou, Fenghua. [5] Registration data gives incorporation on 11 April 2017; the website claims a 2008 business origin. The reviewed sources do not establish a predecessor relationship. The earlier year is not presented as incorporation of this legal entity.

Ask the offer to identify manufacturer, contracting entity, invoice issuer and collection site. Placeholder-looking email cells remain preserved in the raw import and are not promoted to verified contacts.

Prepare a component package

Sources for this company

  1. Official company introduction

    Exact Chinese entity, manufacturing scope and claimed 2008 origin. No independent plant audit or current certificate.

    Checked: 2026-10-11
  2. Original 4V210-08 photograph

    Visible model and 0.15–0.8 MPa marking; no complete electrical or dimensional sheet.

    Checked: 2026-10-11
  3. Catalogue identification discrepancy

    Entry headed 4V shows a 4R210-08 manual-valve photograph. Not interchangeable by this evidence.

    Checked: 2026-10-11
  4. Official workshop gallery

    Supplier photographs, not a dated inspection or demonstrated capacity.

    Checked: 2026-10-11
  5. Official contact and location

    Xinjian Village, Xikou contact location.

    Checked: 2026-10-11
  6. Festo pneumatic-valve function explanation

    General port/position notation and switching behaviour; no Shunfa endorsement or specifications.

    Checked: 2026-10-11

Written for buyers from the manufacturer’s published information and the sources listed on this page, with AI assistance. Ask the manufacturer to confirm specifications, documents and terms for your order.